CASE STUDY

Flare Stack Refurbishment – Tartan Oil Platform

Client: Talisman Energy (UK)

Industry: Offshore

Scope: Flare Stack Refurbishment – Tartan Oil Platform

Date: August 2008

Location: UK

Products: RA 900

OVERVIEW

The offshore Oil Platform required the flare stack to be re-coated whilst in operation. The original TSA specification had broken down but would not be feasible as an on-site repair system.

CHALLENGE

Working at height and high substrate temperatures, combined with the fact no blasting was permitted, made the project extremely difficult.

SOLUTION

Two coats of Hot-cote™ RA 900 silicon hybrid high temperature rust tolerant system @ 80µ per coat by brush and roller was applied.

OUTCOME

The technical benefits offered by this system ensured that the work was carried out on time, within budget and with no major delays. Since this project has been completed, similar areas have been specified using Hot-cote™ RA 900 series.

BENEFITS

• No blasting required
• No major delays to program
• Reduced cost of plant and equipment
• Reduced H&S and Fire Precaution
• Chemco system will protect the steel substrate in excess of 10 years

aerial view of large flare stack over offshore platform

Completed Application

aerial view of large flare stack over offshore platform

Completed Application

Contact Our Specialist Coating Advisors

Our coating specialists can suggest the right solution for your specific application.

Get more info on our
Products & Services…

Our coating specialists can suggest the right solution for your specific application.

Go to Top