CASE STUDY
Pump Refurbishment
OVERVIEW
A number of large pumps had to be refurbished, most of which are suffering from stress corrosion and cavitation.
CHALLENGE
Some metal/physical integrity had to be restored prior to any coating works.
SOLUTION
Metal stitching using Ceram-chem™ RH 500 (metal putty), Epo-chem™ RA 500 series and Ceram-chem™ RP 500 topcoats.
OUTCOME
The major technical benefits offered by utilising this system assured the client that the work was carried out safely, on time and with no major delays to the programme.
BENEFITS
• No disruption to other works
• No major delays to programme
• Reduced H&S and Fire Precaution
• Reduced cost of plant and equipment