CASE STUDY

Secondary Containment Bund Refurbishment

Client: SK Energy

Industry: Petrochemical

Scope: Secondary Containment Bund Refurbishment

Date: May 2017

Location: South Korea

Products: RH 800 & RA 500M

OVERVIEW

The bund area for a Sodium Hydroxide (5%) line is continuously wet from chemicals, water and steam splash and as a result has deteriorated.

CHALLENGE

Due to a strict project time schedule, there was not enough time allowed for the bund to dry. Therefore a coating system which could be applied on a wet surface was required.

SOLUTION

Water jetting was utilised as the surface preparation method. One coat of concrete primer Damp-crete™ RH 800 was then applied. This was followed to two coats of solvent-free, wet tolerant epoxy Epo-chem™ RA 500M.

OUTCOME

Significant time and cost savings were achieved by utilising this unique system. The entire project was completed in three days compared to the one week quoted to use conventional paint systems.

BENEFITS

• Solvent-free
• Wet tolerant
• Substantial time and cost savings
• No disruption to working facility
• No humidity or dew point restrictions
• Quick back-in-service times

rusted unpainted bund surrounded by piping

Before Application

bund painted in white attached to metal piping

Completed Application

Contact Our Specialist Coating Advisors

Our coating specialists can suggest the right solution for your specific application.

Get more info on our
Products & Services…

Our coating specialists can suggest the right solution for your specific application.

Go to Top